Manganese Ore Specifications
| Grade |
Mn (%) |
Fe (%) |
SiO2 (%) |
Al2O3 (%) |
Phos (%) |
Size |
Loading Rate |
| 38/36% |
36 (Min) |
15 (Min) |
5 (Max) |
8 (Max) |
0.05 (Max) |
6mm-75mm 85% Min |
5000 MT (GRAB SHINC) 6000 MT (T.V.) |
| (Minimum) |
36 (Min) |
18 (Max) |
6 (Max) |
8 (Max) |
0.09 (Max) |
6mm 75mm 80% Min |
2500 MT WWDSHX basis 5 hatches and geared vsl
with min 25 ton cranes 1500 MT WMT SHEX for non-geared vsls. NOR to be issued
during office working hrs. 24 hrs. turn time. |
| 46/44% |
44 (Min) |
18 (Max) |
13 (Max) |
3.5 (Max) |
0.17 (Max) |
6mm 75mm 80% Min |
2500 MTWWDSHEX basis 5 hatches and geared vsl
with min 25 ton cranes 1500 WMT SHEX for non-geared vsls. NOR to be issued
during office working hrs. 24 hrs. turn time. |
|