Manganese Ore
 
 

Manganese Ore Specifications

Grade Mn (%) Fe (%) SiO2 (%) Al2O3 (%) Phos (%) Size Loading Rate
38/36% 36
(Min)
15
(Min)
5
(Max)
8
(Max)
0.05
(Max)
6mm-75mm
85% Min
5000 MT (GRAB SHINC)
6000 MT (T.V.)
(Minimum) 36 (Min) 18 (Max) 6 (Max) 8 (Max) 0.09 (Max) 6mm
75mm
80% Min
2500 MT WWDSHX basis 5 hatches and geared vsl with min 25 ton cranes 1500 MT WMT SHEX for non-geared vsls. NOR to be issued during office working hrs. 24 hrs. turn time.
46/44% 44 (Min) 18 (Max) 13 (Max) 3.5 (Max) 0.17 (Max) 6mm
75mm
80% Min
2500 MTWWDSHEX basis 5 hatches and geared vsl with min 25 ton cranes 1500 WMT SHEX for non-geared vsls. NOR to be issued during office working hrs. 24 hrs. turn time.
 
Top    
 
 © 2008 QUEST GLOBAL LTD. Site Map | Contact Us | Terms of Use